Turnkey Projects

We offer complete solution for setting up pharmaceutical formulation projects including layout designs, detailed engineering, capacity calculation based on client input, engineering specifications, HVAC System design, on-time supply of equipment, installation, commissioning, etc. Company has a pool of dedicated & sector-specific experienced professionals from the field.

We offer pharmaceuticals turnkey projects as per WHO-GMP, USFDA, MHRA, TGA and cGMP norms & requirements. We offer cost effective solutions to set up pharmaceutical projects as well as modification of existing facilities. From project planning, production machinery to packaging material for finished goods, all fall within our ambit. With wide industry experience, company has aspired & quite successfully to penetrate domestic & international market with products & services at the higher end of technology.

We have a vast experience for complete setup of pharmaceutical manufacturing unit which include IV fluids, Injectables, Tablet, Capsule, Liquid orals, Liquid externals, Powders, Bulk drugs, corrugated box unit, Hard & soft gelatin capsules manufacturing unit, Ayurvedic manufacturing unit.

Services Offered by us:

  • Detailed engineering and drawings
  • HVAC system design including detailed drawings
  • Drawing up the detailed engineering specifications for production equipments and HVAC
  • Supply of complete production equipment as well as the HVAC systems
  • Supervision of construction of factory
  • Installation and commissioning of plant

Our turnkey solutions services can be categories as below. Please follow link of each point to get detail information.

Complete layout designing

We provide complete layout designing for pharmaceuticals manufacturing plant which include design of different areas like:

  • Complete laboratory setup designs (Instrumental, chemical, microbiological Lab, Stability lab, Control sample area)
  • Complete design for manufacturing areas for different dosage form as par GMP(Good manufacturing practices),WHO-GMP,USFDA,MHRA norms.
  • Ware house design which includes Raw material, packing material, finished goods store.
  • Workers change room areas for maintaining cleaning & sanitation inside & outside unit.
  • Complete civil work

  • Environmental Engineering

  • HVAC (Heat ventilation & air condition) planning

  • Plant safety guidelines

  • Complete electrical work

  • Other work


Translate »